Want to upgrade to a DC Fast Charger? Your existing single-phase EV meter may not support it. We handle complete EV Meter load enhancement in Mumbai — from MSEDCL/Tata Power application to new MCB and wiring.
When you install an EV Meter, you generally get a load of 2kW or 3.3kW — which is enough for a basic AC home charger. But if you want to upgrade to a 7kW AC or 22kW DC fast charger, your existing EV meter's load capacity will be insufficient.
In this case, we perform EV Meter Load Enhancement — which means obtaining permission from the utility board to increase the load and installing new MCBs, cabling, and wiring accordingly.
The cost for an EV meter load change ranges from ₹3,000 to ₹12,000, depending on the magnitude of the load change and the required wiring work.
Yes. Three-phase power must be available at the society's main supply. We conduct a site survey and handle the full upgrade process.
The EV meter supply is turned off for a short time — only during the installation. Your home's main electricity supply remains unaffected.
Related Services:
Searching for "EV meter near me"? We offer same-day visits across all of Mumbai, Thane, and Navi Mumbai.
Get a free site visit and expert consultation today. Serving all Mumbai, Navi Mumbai, Thane & Maharashtra.